BEYOND 99by Maksim Sidenkov

knitwear

I live right in the heart of the knitwear cluster, in the town of Dalang (大朗, Dàlǎng) — and focus on manufacturing in this category.
in the video, I explain how this whole operation works behind the scenes and how we can work together to launch your product

minimum order quantity

ready-made products

≈ 20 units per color

Different sizes can be included. From 50 units per color, composition labels and tags can be replaced with your own

upper-mid / premium

100–150 units per color

Made-to-order production: one color can include 3–4 sizes. If more sizes are needed, the minimum order quantity may increase

budget / mid-range

200–300 units per color

The order can include different sizes, your own composition labels, logos and more

The minimum order applies to each style and color combination

production timelines and product costing

An initial estimate can be provided even from a photo. The exact price is determined after the first sample is made and all specifications are agreed, or immediately if a physical sample and order details are available

For a quote, we need to know:

  • fiber composition
  • size specification
  • number of sizes
  • total order quantity
  • deadline (limited timeframe)
  • target price
  1. Yarn for knitwear development
    12–7 days

    preparing technical specifications

    The goal is to make the production brief as precise as possible. A measurement specification, number of sizes, order quantity, and fiber composition are enough. An initial product cost estimate is prepared at the same time

    We can work from a photo if there is no physical sample, but this usually extends the development time

    22–14 days

    sample development

    The sample is developed for a preselected market segment, which determines the yarn quality and the factory that will produce the order

    Development costs 500–3,000 yuan, depending on the factory and yarn grade. The amount is refunded when an order is placed

    For a complex sample, yarn in the required color may not be in stock. For bulk production, yarn in the required color can be ordered separately

  2. Knitwear manufacturing
    35–10 days

    sample revision

    We check the fit and quality of the knitted garment. 2–3 rounds of revisions are included — usually enough to get the sample right

    46–25 days

    bulk production

    Timing depends on the factory, available production capacity, and the product's complexity and tier

  3. Ready-made knitwear
    51–4 days

    QC — quality control

    Every batch is inspected, packed and prepared for shipping before dispatch

    6CIS: 8–14 days · Russia: 18–25 days

    logistics

    Transit time depends on the destination country and route. For CIS countries other than Russia, the estimate is 8–14 days; for Russia, 18–25 days

Timelines are indicative. Final terms, pricing, and delivery date will be agreed for your project

Beyond 99 catalogs

Browse the styles and save your favorites to discuss

Catalogue cover «knitwear · women’s styles for marketplaces»PDF
styles for online marketplaces

knitwear · women’s styles for marketplaces

Catalogue cover «cardigans»PDF
mid-range and premium segments

cardigans

Catalogue cover «sweaters»PDF
styles for online marketplaces

sweaters

Catalogue cover «men’s classic styles catalog»PDF
Classic styles

men’s classic styles catalog

Catalogue cover «women's knitwear capsule collection»PDF
middle / middle up

women's knitwear capsule collection

Catalogue cover «Mid-range and premium styles»PDF
Textures, yarns and compositions catalog

Mid-range and premium styles

Calculate your order

Tell us about the style, quantity and timeline

An estimate for your product

Fill in your details — it takes 1–5 minutes. Maxim will contact you personally within 24 hours